HOUSING FOR TSUNAMI DISASTER VICTIMS IN ACEH

 

Foto 1: Maket RIA skala 1: 5

Foto 2 : Model struktur simple rigid frame.

Foto 3: Mock up halaman di Jurusan Arsitektur ITS

Foto 4: Hasil jadi RI-A, Mock up 4X5 m ditambah dengan kamar mandi.

Foto 5: Launching RI-A oleh Rektor ITS, didampingi Prof. Ir. Johan Silas selaku Principal Architect, Jumat 7 Januari 2005.

Foto 6: Project Officer RI-A, Wahyu Setiawan ST, MT memberikan penjelasan mekanisme perencanaan dan pembangunan.

Foto 7: Team RI-A dari Laboratorium Perumahan dan Permukiman, Jurusan Arsitektur, FTSP-ITS, berpose bersama. Dari kanan ke kiri: Aldrin Yusuf ST, Hertiari Idajati ST, Andarita Rolalisasi ST, Susetyo Firmaningtyas ST MT, Erika Yuniastuti ST, Andon Setyo Wibowo ST MT.

CONTEXT :

The quake and the Tsunami on 26 December 2004 morning has severely destroyed the province of ACEH and North Sumatera.In the field many areas cannot be accessed in any way nor are any resources available to support the rehabilitation effort. Therefore ITS developed a house that response to the very limited condition and the house by ITS is the response to it (RI-A).

PRINCIPLE :

A special type and technology in house construction is needed that can be done by an ordinary person such as the house owner in the most remote area with limited support in resource needed. There are three advantages of the RI-A house :

  1. BY ALL
    Any person can do it without any special skill needed.
  2. FOR ALL
    Can be applied for any purpose from housing to school, clinic, market, mosque, etc. Based on simple and effective module.
  3. WITH SO LITTLE TIME
    Can be finished in a relative short time using mono building material mainly plank (2x20x400 cm.) and nail. The tools needed are hand saw and hammer. A house of 26 m2 built by four persons can be finished in one day time.

CORE MODULE :

Core house module is 4x5m (main room) with toilet and bath facility of 1,5x2m and kitchennet of 1,5X 2m linked to the rear terrace.

VARIANT MODULES :

After gaining the skill to built the core house, it can be extended to variant models of 5x5m, 6x5m, 7x5m and 8x5m according to the need and function of the building.

STRUCTURE :

Monolith main frame to meet earthquake requirement . Simple rigid frame as the main structure of column and truss with 5m span that can be enlarged.

Sub-structure

Block foundation of 35 X 35 X 35cm as footing foundation of each column.

COST :

Ordinary market price in Surabaya Rps 9 millions, 4-5 adults, One day work hour.

MATERIAL SPECIFICATION & TOOLS :

  • Wooden plank of 2x20 cm length 4 m
  • DI sheet 105x210 cm
  • Nail 7 cm and 4 cm
  • Hand saw
  • Hammer with nail extraction end
  • Measuring tape
  • Machete
  • Cangkul (Earth digger)

RI-A's TEAM :

Principal Architect : Prof. Ir. Johan Silas
Project Architect : Wahyu Setyawan, ST MT
Architects : Ir. Andon Setyowibowo MT & Ir Sutan Hasian Siregar MT
Junior Architects : Hertiari Idajati ST, Aldrin Yusuf ST, Erika Yuni Astuti ST, Susetyo Firmaningtyas ST MT
Support : Sukito & Sarbeni
Koordinator Pelaksana : Prof.Ir. Priyo Suprobo, MS, PhD

MORE PICTURES :

Foto 8: Cukup bermodalkan palu dan gergaji untuk mengerjakan RI-A

Foto 9: Sambungan kuda-kuda paku, tanpa coakan.

Foto 10: Detail sambungan kolom, juga hanya menggunakan paku.

Foto 11: : Ventilasi di dua sisi, untuk sistem penghawaan alami.

Foto 12 : Skur pengaku struktur .

Foto 13: Modul ukuran 4 X 5 meter bisa dikembangkan sesuai kebutuhan.

Foto 14: Mendirikan kuda-kuda memerlukan 4 orang untuk mengangkat bersama-sama. Melibatkan calon penghuni agar dapat mendirikan rumahnya sendiri adalah yang terpenting menurut Prof. Johan Silas.

Foto 15: kamar mandi berukuran 1,5 x 2m.

Foto 16: Denah RI-A, dilengkapi dengan kamar mandi dan dapur di teras belakang.